Welcome to Hengshui Jianfeng Engineering Rubber co., LTD.,

Inspection of bridge expansion joint

author: Jianfeng Engineering from: ԭ date: 2017/7/15 9:00:00 hit: 9827
Tips: Check whether the gap between the beam is in line with the requirements, if not in line with the nee...

Check whether the gap between the beam is in line with the requirements, if not in line with the need for processing has reached the requirements. Check the gap between the beam is in line with the requirements, if not in line with the need to handle has reached the requirements.

The check whether the corresponding embedded bar with a telescopic device anchoring ring, such as the existence of dislocation, phase torsion problems should be adjust the anchor ring. Check whether the corresponding pre buried steel and anchor ring expansion device, such as the existence of dislocation, phase torsion problems should be adjust the anchor ring.

How to ensure the effective connection of embedded steel ring and the welding seam, should be based on the actual size, preparation of a number of different specifications to ensure that the effective welded steel ring and embedded parts, should be based on the actual gap size, steel plate as liners. Steel as liners.

Check the concrete beam and the top beam at the end of the existence of defects, the defect should be reinforced. The top of the beam and end beam inspection of concrete defects, the defect should be reinforced.


  

contact us

TEL: +8613132415777
FAX: 86-318-8538660
Email: eric@prolianz.com
sales@prolianz.com
URL: http://www.prolianz.com
ADD: Hengshui City, Hebei Province, China

Copyright © 2016 Hengshui Jianfeng Engineering Rubber co., LTD., All Rights Reserved.
SITEMAP | XML | RSS