Buried steel edged rubber waterstop construction

author: Jianfeng Engineering from: ԭ date: 2017/6/28 18:00:00 hit: 9612
Tips: Buried steel edged rubber waterstop construction process:A, the embedded steel edged rubber water st...

Buried steel edged rubber waterstop construction process:

A, the embedded steel edged rubber water stop in the expansion joint of lap 100mm putty, hand pressing air is excluded by its own firm adhesion, and strengthening rolling again after affixed protective film.

B, will be buried in the type of rubber watertight strip placed in the middle position of the wall, with a wire fixed on the steel strip, slightly higher than the concrete interface.

C, then the first time before pouring, the expansion protective film at the lower end of the waterstop putty is removed, the pouring of concrete to steel expansion 1 / 21 / 3 at two times the width of the putty, before pouring the upper protective film is removed, and then pouring the waterstop preservation and transport note 1, will not stop steel board putty strips not open for a long time.

2, among the embedded steel edged rubber water stop in storage, not in contact with the chemical paint contamination strong.

3, to prevent mechanical products during transport, steel and other damage to the sealing belt.

4, in the rainy days should not be construction, usually the construction temperature should be controlled at 15 degrees -35 degrees Celsius.


  

contact us

TEL: +8613132415777
FAX: 86-318-8538660
Email: eric@prolianz.com
sales@prolianz.com
URL: http://www.prolianz.com
ADD: Hengshui City, Hebei Province, China

Copyright © 2016 Hengshui Jianfeng Engineering Rubber co., LTD., All Rights Reserved.
SITEMAP | XML | RSS