Welcome to Hengshui Jianfeng Engineering Rubber co., LTD.,

Construction procedure of poly - sulfur sealant

author: Jianfeng Engineering from: ԭ date: 2017/10/19 18:00:00 hit: 8313
Tips: Construction procedure of poly - sulfur sealantPolysulfide sealant waterproof products and construct...

Construction procedure of poly - sulfur sealant

Polysulfide sealant waterproof products and construction methods: primary treatment: must be neat with sticky surface (available portable cutting machine, grinding wheel, steel brush), the coating surface exposed structure layer firmly. The joint surface must be completely dry, clean, no frost. All the surface dust and cement slurry must be brushed clean rust and paint. The protection of metal surfaces are also removed. Such structures are not available. The first drying dry, blowtorch primer coated surface before coating. The primer liquid only need to brush a thin layer, the surface is not sticky rear can be coated with sealant. (the company is supporting the various primer supply)



  

contact us

TEL: +8613132415777
FAX: 86-318-8538660
Email: eric@prolianz.com
sales@prolianz.com
URL: http://www.prolianz.com
ADD: Hengshui City, Hebei Province, China

Copyright © 2016 Hengshui Jianfeng Engineering Rubber co., LTD., All Rights Reserved.
SITEMAP | XML | RSS